Please enable JavaScript in your browser to complete this form.Please enable JavaScript in your browser to complete this form.Contact InformationFull Name *Company Name *Email Address: *Phone NumberRole in the ProjectProperty ManagerPlant ManagerIndustrial EngineerReal Estate DeveloperFinancial Decision-MakerSustainability OfficerOther (please specify)Facility InformationFacility Name/Location: *Type of Facility *Manufacturing PlantProcessing PlantDistribution CenterIndustrial ParkHeavy Industry FacilityOther (please specify)Existing Facility or New Development: Existing StructureNew BuildTotal Facility Size (in square feet)Current Energy Infrastructure (Select all that apply)Existing HVAC SystemBackup Power SystemsSolar Energy SystemsEnergy StorageNone/Planning StageProject GoalsWhat are your primary goals for this project? (Select all that apply) Reduce Operational CostsImprove Energy EfficiencyMeet Sustainability or ESG GoalsIntegrate Renewable Energy (e.g., Solar Energy)Ensure Uninterrupted Operations (Backup Power)Optimize Material Spend and ProcurementFuture-Proof the Facility (e.g., Microgrids, Distributed Energy)Other (please specify)Which systems are you interested in implementing? (Select all that apply)Energy-Efficient HVAC SystemsSolar Energy IntegrationBackup Power Solutions (Generators/Energy Storage)Industrial Lighting and Process EquipmentSmart Energy Management SystemsCompressed Air and Process Optimization SystemsHeating and Cooling SystemsBoiler SystemsOther (please specify)4. Energy Review and Material AssessmentAre you interested in an Energy Review for your facility?YesNoAlready CompletedDo you need a Material Spend Assessment to optimize procurement and material costs?YesNoNot SureWhat are your primary energy concerns? (Select all that apply)High Energy CostsInefficient Equipment or SystemsGrid RelianceSustainability and ESG ComplianceReliability of Energy SystemsOther (please specify)5. Procurement and LogisticsWould you like PES to handle material procurement for this project? YesNoOpen to DiscussEstimated Budget for Energy SystemsUnder $100,000$100,000 – $500,000$500,000 – $1,000,000Over $1,000,000Is reducing the cost of materials and optimizing procurement a priority?YesNoWould you like PES to coordinate logistics for delivery of materials to your site?YesNo6. Installation PreferencesInstallation OptionsI have my own installation team.I would like to use a provider from the PES PowerLink Network.Open to either option.Preferred Installation Start Date:Are there any specific challenges or requirements for this installation? (e.g., timelines, site access, integration with existing systems)7. Future-Proofing and ResilienceAre you interested in future-proofing your facility with the following? (Select all that apply)MicrogridsDistributed Energy SystemsSmart Grid IntegrationBackup Power and Energy StorageHeating and Cooling SystemsBoiler SystemsOther (please specify)Would you like to explore monetizing energy savings through renewable energy (e.g., selling solar power back to the grid)?YesNoNot Sure8. Incentives and RebatesAre you interested in exploring federal, state, and local incentives or rebates for energy upgrades?YesNoWould you like PES to assist with identifying and applying for available energy incentives and tax credits?YesNo9. Financial Planning and ROIIs maximizing ROI and reducing long-term operational costs a primary goal?YesNoDo you have a financial model or target IRR (Internal Rate of Return) for this project?YesNoOpen to DiscussWould you like to explore creative financing options (e.g., Power Purchase Agreements, tax credit financing) for funding this project?YesNoOpen to Discuss10. Documentation Submission• Please upload any relevant documents (energy bills, current system specifications, etc.) to help us evaluate your facility's energy use and create a comprehensive plan. Click or drag files to this area to upload. You can upload up to 10 files. Alternate Submission: If you prefer to email your documents, please send them to [[email protected]].11. Scheduling a Call interested long-term IRR Would you like to schedule a call with a PES representative to discuss your project in more detail?YesNoPreferred Date and Time for the CallMorningAfternoonEveningAre there specific topics or questions you’d like to discuss during the call? (e.g., financing, procurement, energy review, material spend)12. Additional InformationPlease provide any additional details about your project or specific needs:13. Submission ConfirmationHow did you hear about PES?ReferralOnline SearchSocial MediaOther (please specify)Would you like to receive updates on PES’s energy solutions and new offerings?YesNoPreferred Contact Method:EmailPhoneBothSubmit Your Project Details